Equipment
PM schedule
Safety permit
Work order
Close-out
PM schedules raise work before failures do. Permits gate the dangerous jobs: LOTO and permit-to-work are part of the flow, not paperwork after it.
MODULE 06 / 08
Equipment, PM schedules and work orders, with LOTO and permits.
Equipment, PM schedules and work orders with safety permits built into the flow, not filed after it.
PM schedules raise work before failures do. Permits gate the dangerous jobs: LOTO and permit-to-work are part of the flow, not paperwork after it.
HOW IT CONNECTS
Maintenance runs standalone. Equipment, schedules and permits live beside the supply flows without depending on them. No module routes in or out.
NO MODULE ROUTES IN OR OUT
No module is sold on its own page. The Blueprint decides the scope: Included, Later or Excluded, from your answers.